Chapter Logo
Skip to content
  • Home
  • About
  • Meetings
  • Donate
  • Projects
    • Current Project
    • Archived Projects
      • 2024 November – Koppel Farms Garden Beds
      • 2019 June – Solar Panel Pump in Nueva Esperanza, Panama
      • 2014 May – Latin American Foot Bridge
      • 2011 Summer: Renewable Energy Project at WSU Organic Farm
      • 2019 June- Solar Panel Pump in Nueva Esperanza, Panama
      • 2011 Summer – Bridge Project in La Hacienda Corinto, El Salvador
  • Privacy Policy
  • Contact

Month: October 2010

Wind Turbine Tower Testing

Posted on October 24, 2010January 21, 2025 by Natalie Smith-Gray

The Structures Team for the Renewable Energy Project tests the wind turbine tower during their Friday meeting. The tower features a tilt-up design with a pivot point 6 feet off the ground. This way the wind turbine can be easily raised and lowered for installation and maintenance.

33,306 Comments

Archives

  • April 2024
  • October 2022
  • December 2019
  • July 2019
  • June 2019
  • May 2019
  • March 2019
  • October 2018
  • October 2010

Meta

  • Register
  • Log in
wsu.ewb@gmail.com
  • Facebook link
  • Instagram link
Zerif Lite developed by ThemeIsle